Completed Projects
What We’ve Accomplished

Apsara Industrial Complex Kariwali Bhiwandi
On Grid Solar Plant
This is a 5Â KWp On Grid Solar Power Plant. The premise is Apsara industrial Complex. There are various organisations operating in said premises. 16 nos. 320Wp Panels are mounted on Sheet Roofing.

Anath Ashram Vasai
250 LPD Solar Water Heater
This is 250 LPD ETC type Solar Water Heating System. It is installed in Orphanage and Oldage home in Vasai. The Solar Water Heater stands on a MS Structure with 4 feet ground clearance.

TMC School Parsik Nagar Kalwa
On Grid Solar Power Plant
This is a 2 KW On Grid Solar Power Plant installed over super structure. This is a government School run by Thane Municipal Corporation, Thane. This School is located in Parsik Nagar Kalwa.

Kinavali Village Shahapur, Thane district
Solar Water Pump
This is a 5Horse Power Solar Pump installed in Kinavali Village in Shahapur Taluka of Thane district. There was no Electrical Supply connection at this location. It was impossible to do farminh on this plot. This issue was Solved by installing 5 HP Solar Water Pump. It is a Shakti ake Solar dc Pump. There are 16 Panels of 300 Wp Each installed in Array which help the pump to operate. The working time of this system is from 11 am to 4.30 pm. It delivers enough water for farming

Chirner, Panvel - petrol pump
On Grid Solar Power Plant
This is a 5 KWp On grid Solar Power Plant. It is an Indian Oil Petrol Pump and 5 KWp On grid system powers the entire Petrol pumps. There is a heavy load of pumps and compressors

Veekay Printers, Pimpalas Bhiwandi
On Grid Solar Power Plant
This is a 30 KWp On Grid Solar Power Plant. There were certain flaws deu to which the power Total utility factor of the solar power plant was lesser. The Oriana Solar and electricals took this project as a consultation and contributed towards improving the power output.

Kasarwadavli Thane - Shantai Bunglow
On Grid Solar Plant
This is a 6 KWp On Grid Solar Power Plant. The Bunglow owners were getting a monthly bill of 7,000/ month. They thought of making the bunglow Solar Powered. There were Several Issues in installation. Oriana Solar & Electricals performed the detailed Site Analysis & measured the customer's requirement. Inspite of Space Constraint the solar plant was installed and the current monthly bill is reduced to 500-900/month. There is good generation inspite of the shadows from nearby Forestation and buildings. The customers are very happy & satisfied.

Thane - K.C. College
On Grid Solar Power Plant
This is a 80 KWp On Grid Solar Power Plant. The Power Plant is Basically Divided in 2 Parts One of 25 KWp & Other of 55 Kwp located on two separate buildings inside the campus. The Solar Power Plant Shall be providing electricity to the educational institutions owned by the trust.Â
It is a Go Green Initiative as said by the director. The Grid Tie Inverters used are installed below the Sheet Roofing on which the Solar Panels have been installed . Each Panel is of 322.5 Wp Capacity. It is one of the great achievements for the college & a medium of inspiration of other educational Colleges in Thane.

Pendur, Kudal - Vetaal Temple
Off Grid Solar Power Plant
This is a 1.5 KWp Off Grid System installed at Vetal Temple in Pendur, Kudal, Maharashtra. The roof is made up of earthern tiles (Kaul) and the panels have been installed on top of it.
​
The Entire temple electricity is now Solar Powered. The Premises is fully lightened with Tube Lights and is spread over vast area of 6000 Sq. Feet. The villagers had an idea to go for an eco friendly alternative for Electricity. The annual electricity bills are also being saved. The Temple trust is satisfied and happy with their decision and felicitated Oriana Solar & Electricals for the project.
​
Shiroli Village, Junnar, Maharashtra
ETC - Solar Water Heating System
This is a 250 LPD Solar Water Heating System.
It is installed over the RCC Roofing of the Rishi Prasad Bunglow in the Village of Shiroli Budruk, Junnar, Maharashtra.
The area received ample Sun Light During the day time and this project is running successfully since its installation
Badlapur - Montana EÂ Wing
Hybrid Solar Power Plant
This is a 1.6 KVA hybrid Solar PV System. This project is a solar Hybrid System. There are 2 Panels of 300 Wp Each installed over the RCC Water Tank. Concrete Blocks were used to support the Structure. The inverter Capacity is 1600VA. The Garden and parking lights work on solar energy in this society. The installation of this project was completed in a span of 2 Days.
Badlapur - Montana C Wing
Hybrid Solar Power Plant
This is a 1.6 KVA hybrid Solar PV System. This project is a solar Hybrid System. There are 2 Panels of 300 Wp Each installed over the RCC Water Tank. Concrete Blocks were used to support the Structure. The inverter Capacity is 1600VA. The Garden and parking lights work on solar energy in this society. The installation of this project was completed in a span of 2 Days.




badlapur - Swanand
A Hybrid Solar Power Plant
This is a 1.6 KVA hybrid Solar PV System. This project is a solar Hybrid System. There are 2 Panels of 300 Wp Each installed over the RCC Terrace. Concrete Blocks were used to support the Structure. The inverter Capacity is 1600VA. The CCTV Cameras work on solar energy in this society.




Panvel - SAI Mandir
An On-Grid Solar Power Plant
This Project is 40 KWp On Grid Power Plant.A total of 160 Solar Panels with each 250 Wp rating are used in installation of this project. There are 2 String Inverters of 20Kwp capacity each installed. The project was one of the most challenging considering the type of roof. There was a analysis of structure done before installation. It is giving good generation throughout the year.



badlapur - panvelkar heights
March 30, 3030
This is a 1.6 KVA hybrid Solar PV System. This project is a solar Hybrid System. There are 2 Panels of 300 Wp Each installed over the RCC Water Tank. MS Channel custom made structure was used to support the Structure. The inverter Capacity is 1600VA. The Passage and parking lights work on solar energy in this society. The installation of this project was completed in a span of 2 Days.